Browsing by Author "Bruner, H. L."
Now showing items 1-7 of 7
-
Chen, H.; Deng, S.; Bruner, H. L.; Claridge, D. E.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)The Kleberg Building on the Texas A&M University campus is a teaching/research facility consisting of classrooms, offices and laboratories, with a total floor area of approximately 165,030 ft2. Continuous Commissioning ...
-
Chen, H.; Deng, S.; Bruner, H. L.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2000)The lecture hall of the Richardson Petroleum Building at Texas A&M University is a large lecture hall, with a total floor area of approximately 2500 ft^2. The lecture hall was served by a constant air volume (CAV) air ...
-
Chen, H.; Deng, S.; Bruner, H. L.; Claridge, D. E.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)Texas A&M University main campus in College Station consists of 114 buildings served by two central plants. The two main campus loops are more than 50 years old with a total piping length for each loop in excess of 13 ...
-
Liu, C.; Bruner, H. L.; Deng, S.; Brundidge, T.; Turner, W. D.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)McKenzie Airport Terminal is located at Easterwood Airport, which is owned and operated by Texas A&M University. It was built in 1988. Most all HVAC equipment, which includes boiler, chiller, pumps, AHUs and exhaust fans, ...
-
Liu, C.; Turner, W. D.; Claridge, D. E.; Deng, S.; Bruner, H. L. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)An investigation into the increase of energy consumption of G. Rollie White Coliseum was part of the persistence project[1], which investigates the savings in energy consumption of ten buildings that were commissioned by ...
-
A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC Deng, S.; Claridge, D. E.; Turner, W. D.; Bruner, H. L.; Williams, L.; Riley, J. G. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...
-
Deng, S.; Claridge, D. E.; Turner, W. D.; Riley, J. G.; Williams, L.; Bruner, H. L. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)The $58.5 million in measured savings for the twelve-year, $10 million continuous commissioning® (CC®) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with ...